Ed Askew
Well-known member
We're moving right along with the duck camp. I did the rough in wiring myself last week, three circuits, one for the inverter (just the lights, ceiling fans, and vents), one for the generator (air conditioner, water heater, battery charger), and a 12 volt circuit for back up lights, nav lights, water pumps, sewerage treatment plant. The guys have got the insulation in this week, and should the paneling up before this weekend. The plumbing is all coming through the floor. So the plan is to install the sheeting, roll out the linoleum floor, install the rough in plumbing, build the bathroom walls, sheet them, paint, then hook up electric and plumbing. We're getting really close and itching to get her out in the marsh. Had some really cool mornings this week, down to 59 here in Hattiesburg, so fall is in the air. I hear they're tearing up the redfish and specks and can't wait to put the hurt on them myself.
Ed.