Cody Williams
Well-known member
Andrew, both those back compartments to port and starboard will be filled with foam. The glove box and cubby will take up very little space, so I should have about 6 cubic feet of floatation in the rear, and about 3 in the front.
Phil, the method I've used for my last 4 builds is to set the stitches, tab between them, and then pull them right before filleting and glassing-easiest way in my opinion!
Phil, the method I've used for my last 4 builds is to set the stitches, tab between them, and then pull them right before filleting and glassing-easiest way in my opinion!
Last edited: