sneakbox rebuild

I have more done just have to take some pics, I forgot to bring the camera for the past two days but will take it tomorrow. I installed a small piece of combing on the edge of the boat. They were cut from left over cedar decking, bedded with epoxy and sawdust then screwed down, and finally coated w/ one coat of thinned epoxy. Had some leftover strips of composite when I did the ice runners but cracked one installing it. I Can honestly say I will would probably not use the composite again it doesn't seem to have the same qualities as wood. It will be interesting to see how it holds up on the bottom of the boat. Oar locks also got installed, bedded with epoxy/ sawdust mix then bolted with stainless carriage bolts. Finally my decoy racks are 90% finished, had to call it quits early have to go in 2hrs early because of the snow. By tomorrow they will be done. Motor board will be installed tomorrow as well. My list of things left are install the floor, put the edge on the shelf,install eyebolts in the back deck, sand the hatch cover, and PAINT!!!!!
 
Pic's
snekboxrestore464.jpg

snekboxrestore465.jpg

snekboxrestore467.jpg

snekboxrestore468.jpg

snekboxrestore469.jpg

snekboxrestore470.jpg

snekboxrestore471.jpg

 
Back
Top