Little project that needed done.  The old vanity lasted 35 years so it was due for an upgrade.  It's in and working, just need to install a TP holder and pick up my tools.
Only ran into one little snag. When the home was built and the contractor installed the J trap, he cross threaded the fitting where it enters the wall. I did not notice that little detail until everything was in place and I went to hook up the new J trap. The correct fix would have been to tear the wall open and replace the damaged fitting. I figured it wasn't leaking before so,,,,,,,,,,, I installed the new J trap cross threaded as well. It is not leaking at this point, I'll keep an eye on it for a while.
		
		
	
	
		 
	
		 
	
				
			Only ran into one little snag. When the home was built and the contractor installed the J trap, he cross threaded the fitting where it enters the wall. I did not notice that little detail until everything was in place and I went to hook up the new J trap. The correct fix would have been to tear the wall open and replace the damaged fitting. I figured it wasn't leaking before so,,,,,,,,,,, I installed the new J trap cross threaded as well. It is not leaking at this point, I'll keep an eye on it for a while.
 
	 
	 
	 
 
		 
 
		
 
 
		
 
 
		
 
 
		 
	 
 
		 
  
 