February workbench

Update on the place for my workbench to go:

We finished up the brick veneer between the weather events. Only brick that is left are the columns on the porch and a well house. HVAC is done, plumbing is done, electrical is 90% done. My friend does commercial HVAC for a living so he and I did the HVAC, I have pulled all the wire for electrical, etc. I am ready to be done!

Inspections next week then it will be time for insulation and sheetrock.

IMG_4906.jpg
 
Covered some of my burlap decoys with walnut shells. I love the textured look they get. I applied a simply paint job as I am limited in my ability. The last picture shows the before and after look.
 

Attachments

  • IMG_1821.JPG
    IMG_1821.JPG
    352.4 KB · Views: 6
  • IMG_1822.JPG
    IMG_1822.JPG
    301.6 KB · Views: 5
  • IMG_1825.JPG
    IMG_1825.JPG
    229.8 KB · Views: 6
  • IMG_1852.JPG
    IMG_1852.JPG
    231.9 KB · Views: 6
Back
Top