John L
Well-known member
We just started loading into the Jacob Javits Center in NYC for the NY Natl Boat show. Instead of having a large travel lift they had two cranes to unload and build the boats this year, a cost saving measure. Savings to who, I don't know. Our bill was still obscene. Talk about not having the right tools for the right job. It took over two hours to rig the 50' Azimut for the lift and get set on blocks. Something that should have taken 20 minutes with a travel lift. In total 10 guys standing around waiting to get some work done. I just don't see the savings in that move.
In all 9 large yachts to set up and get ready over the next two days then on to the smaller sport boats
Anyone going to the show?


In all 9 large yachts to set up and get ready over the next two days then on to the smaller sport boats
Anyone going to the show?