Steve Sanford
Well-known member
Matthias~Very intuitive RM, are you psychic? You are actually correct, I do have a receiver hitch of sorts under the deck!
I'll go into more detail, later in my build thread because there is actually a cool story behind the construction of the bollard.
But briefly — I found an off-cut of aluminium square tube in our scrap pile which happened to be the perfect sleeve for the bollard. Later when I’m ready to mount the bollard I’ll pour in some epoxy to glue it in. It would have been too complicated to glass the bollard into the anchor well once the deck was on, and I wouldn’t have been able to already paint the well which was much easier while it was open.
View attachment 73996
I been thoroughly enjoying this thread - appreciating your fine craftsmanship and creativity. Great work all around on a sweet vessel!
BTW: As you have already shown - doing as much as you can BEFORE the decks are on is a very important "rule" in any build. (Yes, I learned this the hard way....)
re Bollard. I would bore a drain hole in the bottom of the "receiver" - just in case. And, I would bed the bollard in 3M 5200 instead of epoxy, especially where it passes through the deck. The pliability at a joint that will get lots of stress on it should wear longer than a brittle adhesive - at least in my experience (more of my seat-of-the-pants engineering).
Congratulations once again!
SJS



